Projects
Case studies with the area, the build time and what we learned. Every site is run by the same crew leaders.
This is a demo: projects, places and figures are invented for illustration.
- New build

Ilinden, Skopje
Family house, Ilinden
Two floors in brick and reinforced concrete, finished a month ahead of the agreed date.
- 240m²
- 9months
- Apartment block

Karpoš, Skopje
Residential block, Karpoš
Thirty-two flats in two phases, so the first families moved in while we finished the second wing.
- 3,200m²
- 18months
- Structural concrete

Gevgelija
Warehouse frame, Gevgelija
A long-span concrete frame poured in weekly sections through the winter.
- 1,800m²
- 7months
- Roofing

Ohrid
Roof replacement, Ohrid
Old tiles out, new timber and insulation in, done in five working weeks around the rain.
- 420m²
- 1months
- Fit-out

Centar, Skopje
Office fit-out, Centar
New electrics, ceilings and floors in an occupied building, with work done at night and at weekends.
- 650m²
- 4months
- Structural concrete

Bitola
Office building frame, Bitola
Five floors of columns and slabs, with a weekly photo report for the owner abroad.
- 2,100m²
- 11months